EDGELEC 100pcs 5mm Warm White Lights LED Diodes White Lens Diffused Round Lens 29mm Long Lead DC 3V +100pcs Resistors for DC 6-12V Included,Bulb Lamps Light Emitting Diode

#ad
EDGELEC #ad - Industrial standard Size, 29mm Long Lead for widely used and convenient for cperation. Soldering condition manual soldering:less than 3 seconds with 482°f-527°f* soldering Condition Reflow Soldering:Less Than 5 Seconds With 500°F* Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.

Low energy Consumption And Low Heat. Product parameters: 29mm long lead / dc 3. 0v - 3. 2v if=20ma / 006 watts / 2pin / DIP LEDs. Product parameters: luminance brighter up to +20% / wavelength 1200K-3500K / 120° Viewing Angle / Single LED Diodes Wight: 0.29g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Included / ±1% Tolerance.

EDGELEC 100pcs 5mm Warm White Lights LED Diodes White Lens Diffused Round Lens 29mm Long Lead DC 3V +100pcs Resistors for DC 6-12V Included,Bulb Lamps Light Emitting Diode #ad - Product features: warm white Lights / 5mm Diffused Round Lens / White Lens. Get other led models? please search "EDGELEC Diodes". Product overview: 100 pcs LED Diodes + 100 pcs Resistors.

#ad



EDGELEC 100pcs 5mm Warm White Lights LED Diodes Clear Round Lens 29mm Long Lead DC 3V +100pcs Resistors for DC 6-12V Included, Bright Bulb Lamps Light Emitting Diode

#ad
EDGELEC #ad - Get other led models? please search "EDGELEC Diodes". Product overview: 100 pcs LED Diodes + 100 pcs Resistors. Product parameters: 29mm long lead / 2pin / dc 3. 0v-3. 2v if=20ma / 006 watts / dip LEDs. Product parameters: luminance brighter up to +20% / 30° Viewing Angle / wavelength 3000K-3500K / Single LED Diodes Wight: 0.

EDGELEC 100pcs 5mm Warm White Lights LED Diodes Clear Round Lens 29mm Long Lead DC 3V +100pcs Resistors for DC 6-12V Included, Bright Bulb Lamps Light Emitting Diode #ad - 29g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Include / ±1% Tolerance. Product features: Warm White - 5mm Round Clear Lens. Low energy Consumption And Low Heat. Industrial standard Size, 29mm Long Lead for widely used and convenient for cperation. Soldering condition manual soldering:less than 3 seconds with 482°f-527°f* soldering Condition Reflow Soldering:Less Than 5 Seconds With 500°F* Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.

#ad



150 Pcs 15 Value 100 ohm- 2M ohm Trimpot Variable Resistor 6mm Potentiometer Assortment Kit

#ad
FUNMANY #ad - Brand new and high Quality Variable Resistor Assortment Kit. Wide assortment of values allowing you to get exactly the resistance you need. Note: not suitable for children under 5 years due to small partswelcome feel free to contact if you have any question! We suppy the best service ! Product overview: 100 pcs LED Diodes + 100 pcs Resistors.

Product features: Warm White - 5mm Round Clear Lens. Product parameters: 29mm long lead / 2pin / dc 3. 0v-3. 2v if=20ma / 006 watts / dip LEDs. Product parameters: luminance brighter up to +20% / wavelength 3000K-3500K / 30° Viewing Angle / Single LED Diodes Wight: 0.29g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Include / ±1% Tolerance.

150 Pcs 15 Value 100 ohm- 2M ohm Trimpot Variable Resistor 6mm Potentiometer Assortment Kit #ad - Package type:15 values, 1kΩ, 2kΩ, 300kΩ, 200kΩ, 200Ω, 100kΩ, 500Ω, 20kΩ, 500kΩ, 5kΩ, 10kΩ, 1mΩ, 100Ω, 2MΩ potentiometer. Package quantity:variable Resistor Assortment Kit 15 Values 150 pcs potentiometers. Adjustment Type: Top Adjustment. They come in a nice storage box, 10pcs for each value. 150 pcs 15 value 100 to 2m ohm variable resistor single-Turn Trimming Potentiometer Assorted KitPerfect starter kit for any electronics hobbyist, every value is packed individually, easy to use and store.

#ad



EDGELEC 100pcs 1 ohm Resistor 1/2w 0.5Watt ±1% Tolerance Metal Film Fixed Resistor, Multiple Values of Resistance Optional

#ad
EDGELEC EFR-W0D50-A:MF #ad - Product parameters: 29mm long lead / 2pin / dc 3. 0v-3. 2v if=20ma / 006 watts / dip LEDs. Product parameters: luminance brighter up to +20% / wavelength 3000K-3500K / 30° Viewing Angle / Single LED Diodes Wight: 0.29g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Include / ±1% Tolerance.

Aaxial-lead resistors: wide Variety Of Applications: Arduino, Electronic And Electrical Experiments. Product: 1 ohm 1/2w 05watt -100 pcs. Product features: Warm White - 5mm Round Clear Lens. Adjustment Type: Top Adjustment. They come in a nice storage box, 10pcs for each value. Brand new and high Quality Variable Resistor Assortment Kit.

EDGELEC 100pcs 1 ohm Resistor 1/2w 0.5Watt ±1% Tolerance Metal Film Fixed Resistor, Multiple Values of Resistance Optional #ad - Anti-static bag Sealed Packaging: Easy to preserve and use. Metal film resistor: excellent noise Suppression, Moisture-Proof, High Temperature Resistance And Long Working Life. 1% tolerance range: Maintaining Sccuracy Over Time. 100pcs - 1 ohm - 05 watt 1/2w metal film resistor* Maximum Diameter Of Section: 3.

#ad



Chanzon 100 pcs 5mm Warm White LED Diode Lights Clear Round Transparent 3000K DC 3V 20mA Super Bright Lighting Bulb Lamps Electronics Components Light Emitting Diodes

#ad
CHANZON #ad - Product: 1 ohm 1/2w 05watt -100 pcs. Product parameters: 29mm long lead / 2pin / dc 3. 0v-3. 2v if=20ma / 006 watts / dip LEDs. Product parameters: luminance brighter up to +20% / wavelength 3000K-3500K / 30° Viewing Angle / Single LED Diodes Wight: 0.29g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Include / ±1% Tolerance.

Aaxial-lead resistors: wide Variety Of Applications: Arduino, Electronic And Electrical Experiments. Polarity 3 v : anode Longer Part | Cathode Shorter Part. Package type:15 values, 1kΩ, 200kΩ, 200Ω, 5kΩ, 500Ω, 100kΩ, 1mΩ, 10kΩ, 500kΩ, 2kΩ, 20kΩ, 300kΩ, 100Ω, 2MΩ potentiometer. Package quantity:variable Resistor Assortment Kit 15 Values 150 pcs potentiometers.

Chanzon 100 pcs 5mm Warm White LED Diode Lights Clear Round Transparent 3000K DC 3V 20mA Super Bright Lighting Bulb Lamps Electronics Components Light Emitting Diodes #ad - Brand new and high Quality Variable Resistor Assortment Kit. Anti-static bag Sealed Packaging: Easy to preserve and use. Shipping weight: 1. 2oz / 0034kg pack of 100 through Hole DIP 2pins LEDs Set. Specification:quantity: 100 pieces / transparent / packlens: 5mm diameter / roundEmitting Color: Warm White 3000KLuminous Intensity: 14000-16000mcdViewing Angle: 30 DegreeForward Voltage / Current: 3V-3.

2v | 20mapolarity: anode longer part | Cathode Shorter PartSearch "chanzon led diode" for more related leds.

#ad



EDGELEC 100pcs 3mm Warm White Lights LED Diodes Clear Round Lens 29mm Long Lead DC 3V +100pcs Resistors for DC 6-12V Included, Bright Bulb Lamps Light Emitting Diode

#ad
EDGELEC #ad - Adjustment Type: Top Adjustment. They come in a nice storage box, 10pcs for each value. Aaxial-lead resistors: wide Variety Of Applications: Arduino, Electronic And Electrical Experiments. Industrial standard Size, 29mm Long Lead for widely used and convenient for cperation. Soldering condition manual soldering:less than 3 seconds with 482°f-527°f* soldering Condition Reflow Soldering:Less Than 5 Seconds With 500°F* Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature.

Get other led models? please search "EDGELEC Diodes". Product parameters: 29mm long lead / dc 3. 0v-3. 2v if=20ma / 006 watts / 2pin / DIP LEDs. Product parameters: luminance brighter up to +20% / wavelength 3000K-3500K / 30° viewing Angle / Single LED Diodes Wight: 0.16g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Included / ±1% Tolerance.

EDGELEC 100pcs 3mm Warm White Lights LED Diodes Clear Round Lens 29mm Long Lead DC 3V +100pcs Resistors for DC 6-12V Included, Bright Bulb Lamps Light Emitting Diode #ad - Anti-static bag Sealed Packaging: Easy to preserve and use. Shipping weight: 1. 2oz / 0034kg pack of 100 through Hole DIP 2pins LEDs Set.

#ad



HiLetgo 20pcs 5MM Photodiode Photosensitive Diode Light Sensitive Diode Round F5 Photodiode 3V

#ad
HiLetgo 3-01-0591 #ad - Product parameters: 29mm long lead / dc 3. 0v-3. 2v if=20ma / 006 watts / 2pin / DIP LEDs. Product parameters: luminance brighter up to +20% / 30° viewing Angle / Wavelength 3000K-3500K / Single LED Diodes Wight: 0.16g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Included / ±1% Tolerance.

Receive range nM 400-1000 Product features: Warm White - 5mm Round Clear Lens. Anti-static bag Sealed Packaging: Easy to preserve and use. Shipping weight: 1. 2oz / 0034kg pack of 100 through Hole DIP 2pins LEDs Set. Product parameters: 29mm long lead / 2pin / dc 3. 0v-3. 2v if=20ma / 006 watts / dip LEDs. Product parameters: luminance brighter up to +20% / 30° Viewing Angle / wavelength 3000K-3500K / Single LED Diodes Wight: 0.

HiLetgo 20pcs 5MM Photodiode Photosensitive Diode Light Sensitive Diode Round F5 Photodiode 3V #ad - 29g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Include / ±1% Tolerance. Voltage:1. 3-1.

#ad



DiCUNO 200pcs 5mm LED Light Emitting Diodes 2pin Assorted Diffused Kit Box Color UV White Red Yellow Green Blue Warm White Pink Orange Chartreuse 10 Colors x 20pcs

#ad
DiCUNO #ad - Metal film resistor: excellent noise Suppression, Moisture-Proof, High Temperature Resistance And Long Working Life. 1% tolerance range: Maintaining Sccuracy Over Time. Product: 1 ohm 1/2w 05watt -100 pcs. Dicuno 5mm bi pin led diodes. Anti-static bag Sealed Packaging: Easy to preserve and use. Shipping weight: 1.

2oz / 0034kg pack of 100 through Hole DIP 2pins LEDs Set. Color : clear, Silver Tone. Material : Plastic, Metal. Product overview: 100 pcs LED Diodes + 100 pcs Resistors. Product overview: 100 pcs LED Diodes + 100 pcs Resistors. Product parameters: 29mm long lead / 2pin / dc 3. 0v-3. 2v if=20ma / 006 watts / dip LEDs.

DiCUNO 200pcs 5mm LED Light Emitting Diodes 2pin Assorted Diffused Kit Box Color UV White Red Yellow Green Blue Warm White Pink Orange Chartreuse 10 Colors x 20pcs #ad - Product parameters: luminance brighter up to +20% / 30° Viewing Angle / wavelength 3000K-3500K / Single LED Diodes Wight: 0.29g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Include / ±1% Tolerance. Wide application: school science experiments, electronic and electrical experiments, car dashboard, DIY LED Projects.

#ad



Electronix Express- Hook up Wire Kit Solid Wire Kit 22 Gage 25 Feet

#ad
RSR Electronics Inc 27WK22SLD25 #ad - Voltage rating: 300 Volts. Insulation: PVC. 010". Forward voltage / direct current : dc 3 Volt 20 mA Low Voltage for DIY PCB Circuit. Material : Plastic, Metal. Temperature rating: -55 degrees C to 105 degrees C. Solid wire kit: six 22 gauge wire spools, 25 ft. Product features: Warm White - 5mm Round Clear Lens. Tinned copper wire.

Each. Product features: Warm White - 3mm Round Clear Lens. Diode head size : 5mm x 5mm / 02" x 02"d*l. Single color warm white super Bright 2500 K - 3000 K. Voltage rating: 300 Volts. Wide application: school science experiments, electronic and electrical experiments, car dashboard, DIY LED Projects. Six 22 gauge solid Wire Spools by Electronix Express.

Electronix Express- Hook up Wire Kit Solid Wire Kit 22 Gage 25 Feet #ad - Package type:15 values, 200kΩ, 500kΩ, 1mΩ, 1kΩ, 2kΩ, 5kΩ, 100kΩ, 10kΩ, 500Ω, 200Ω, 20kΩ, 300kΩ, 100Ω, 2MΩ potentiometer. Package quantity:variable Resistor Assortment Kit 15 Values 150 pcs potentiometers. Polarity 3 v : anode Longer Part | Cathode Shorter Part. Product: 1 ohm 1/2w 05watt -100 pcs.

#ad



EDGELEC 100pcs 1 ohm Resistor 1/4w 0.25 Watt ±1% Tolerance Metal Film Fixed Resistor, Multiple Values of Resistance Optional

#ad
EDGELEC EFR-W0D25-A:MF #ad - 100pcs - 1 ohm - 025 watt 1/4w metal film resistor* Maximum Diameter Of Section: 6mm ±05mm* length Excluding Lead: 2. 3mm ±03mm product overview: 100 pcs LED Diodes + 100 pcs Resistors. Resistant to water, oil - also flame retardant. Diode head size : 5mm x 5mm / 02" x 02"d*l. Brand new and high Quality Variable Resistor Assortment Kit.

EDGELEC 100pcs 1 ohm Resistor 1/4w 0.25 Watt ±1% Tolerance Metal Film Fixed Resistor, Multiple Values of Resistance Optional #ad - Product: 1 ohm 1/2w 05watt -100 pcs. Adjustment Type: Top Adjustment. They come in a nice storage box, 10pcs for each value. Receive range nM 400-1000 Package: kit box with parameter paper for easy storage, 10 colors×20=200 Pieces. Forward voltage: r/y/o/c 2. 0-2. 2v, w/g/b/p/uv/ww 3. 0-3. 2v; current: 20ma; Beam Angle: 30°.

Product parameters: 29mm long lead / dc 3. 0v-3. 2v if=20ma / 0

#ad



Glarks 112Pcs 2.54mm Male and Female Pin Header Connector Assortment Kit, 100pcs Stackable Shield Header and 12pcs Breakaway PCB Board Pin Header for Arduino Prototype Shield

#ad
Glarks 8541770554 #ad - Material : Plastic, Metal. 4. Specification: material: Insulated plastic, hard metal pin All Products Spacing: 2. 54mm/01 inches number of pins: 4pin, 10pin, 10mm, 8pin, instrumentation, electrical appliances, 40pin Row Type: Single row and double row Gender of Connector: Male and Female Pin length: 2mm, 6pin, 11mm Application: Widely be used in Arduino Electronic DIY, such as for electronic circuit, PCB circuit board etc.

Glarks 112Pcs 2.54mm Male and Female Pin Header Connector Assortment Kit, 100pcs Stackable Shield Header and 12pcs Breakaway PCB Board Pin Header for Arduino Prototype Shield #ad - Forward voltage: r/y/o/c 2. 0-2. 2v, w/g/b/p/uv/ww 3. 0-3. 2v; current: 20ma; Beam Angle: 30°. Product parameters: 29mm long lead / dc 3. 0v-3. 2v if=20ma / 006 watts / 2pin / DIP LEDs. Product parameters: luminance brighter up to +20% / 30° viewing Angle / Wavelength 3000K-3500K / Single LED Diodes Wight: 0.16g. Accessories: 100pcs 430ohm for dc 6-12v 1/4 Watt Metal Film Resistors Included / ±1% Tolerance.

Single color warm white super Bright 2500 K - 3000 K. Aaxial-lead resistors: wide Variety Of Applications: Arduino, Electronic And Electrical Experiments. Receive range nM 400-1000

#ad